As a guide, production for custom printed cotton takes 7–21 days and for polyester and Lycra 2–7 business days, but your exact date depends on proof approval and quantity, and we confirm it with your CAD proof. Production only starts once you have approved your proof and paid, so the fastest way to get your fabric sooner is a print-ready file and a quick approval; shipping time from Istanbul comes on top.

Below: what happens at each stage, why cotton takes longer than polyester, what can slow an order down, and how to plan a launch or sample deadline.

Production time by fabric type

Fabric family Examples Print method Production time Minimum per design
Cotton knits and wovens Stretch Cotton Jersey, Cotton Poplin, Cotton Sateen, Muslin, Canvas Reactive 7–21 days (guide) 5 m
Polyester and sportswear Sport Lycra, Swimsuit Lycra, Scuba, Poly Stretch Jersey Sublimation 2–7 business days (guide) No minimum, from 1 m

Viscose and linen are also reactive printed with a 5 m minimum. Some made-to-order qualities take 3–4 weeks. These ranges are a guide: the date for your order depends on proof approval, quantity and the fabric you choose, and we confirm it with your proof. Every quality, with its width and weight, is on the all fabrics page, and current prices are on the fabric pricing page.

What happens between upload and delivery

  1. Upload your design. You submit your file on the print your own fabrics page, choose a base fabric and quantity, and place your order.
  2. File review and CAD proof. Our team reviews the file and sends you a CAD (Computer-Aided Design) proof with a ruler, so you can check the print scale and dimensions.
  3. Your approval. Production does not start until you approve the CAD. This is the step you control.
  4. Printing and finishing. We print with our print partners in Istanbul. Reactive-printed fabrics are then steamed and washed to fix colour and shrinkage.
  5. Ready to ship. We notify you when your fabric is ready and finalise any outstanding balance; full payment must be received before shipping.
  6. Shipping. Fabric is shipped from Istanbul, with EUR.1 / origin documentation where the destination qualifies.

The expected date for your order is confirmed with your CAD proof, so you know where you stand before production starts.

Digitally printed fabric from a recent order, laid out after printing
Digitally printed fabric from a recent order

Why cotton takes longer than polyester

Reactive printing has more steps

On cotton, viscose and linen, the dye bonds chemically with the fibre. After printing, the cloth is steamed and washed as one continuous length to fix the colour and remove excess dye, then dried and finished. Those wet-processing stages, and the need to run a minimum length for consistent colour, are why cotton has a longer window and a 5 m minimum. Our guide to reactive printing explains the process in more detail.

Sublimation is a dry process

On polyester and Lycra, the design is transferred into the fibre with heat. There is no dye bath or washing stage, so a single metre prints as reliably as fifty and the job moves faster. If your deadline is tight and the project allows a synthetic base, polyester is the quicker route.

What can slow an order down

  • A file that is not print-ready. Low resolution, a repeat that does not tile seamlessly or the wrong colour mode means a revised file and a new CAD. We recommend TIFF in RGB at a minimum of 300 DPI at actual print size; see what DPI you need for fabric printing.
  • Waiting on CAD approval. Each day a proof sits unapproved is a day added to delivery.
  • Payment. Full payment is required before production begins on most orders, so an unpaid order does not enter production.
  • Quantity and base fabric. Larger runs and some made-to-order qualities take longer; we confirm the date for your order with your proof.
  • Changing scale or colour late. Decide scale and colour before you approve; read why printed colours differ from the screen if colour is critical.

Working to a deadline and your design is not print-ready, or you only have an idea? Our pattern design team can fix resolution, rebuild a seamless repeat, rescale it or draw an original pattern inspired by your references, for a flat €35 per design, so your file is right before the CAD stage.

See the pattern design service →

How to plan around a deadline

  • Choose your base early. Order a swatch pack (€9 plus shipping) to compare hand, weight and opacity before you place the main order, rather than deciding after a full run.
  • Test on polyester. On sublimation qualities you can order a 20 × 20 cm test print of your own design to check colour and scale.
  • Work backwards. Take your launch or sewing date, subtract shipping time to your country, then the production window for your fabric, then a few days for file review and approval.
  • Use the upper end of the range. For cotton, plan around the longer end of the guide range until your proof confirms the date.
  • Ordering regularly? Open a trade account and tell us about your typical qualities and quantities so we can plan your orders with you.
Jersey Print Factory swatch card showing the printed face of Stretch Cotton Jersey
Swatch pack card: Stretch Cotton Jersey, 210 gsm

Ready to start the clock? Upload your design and approve your CAD proof as soon as it arrives. Not sure which fabric yet? Order a swatch pack first. Need a print-ready file? Use our pattern design service. Have a fixed date? Contact us with your quality, metreage and destination before ordering and we will tell you what is realistic.

FAQ

How long does custom fabric printing take?

As a guide, 7–21 days for cotton base fabrics and 2–7 business days for polyester and Lycra. The exact date depends on proof approval and quantity, and we confirm it with your proof. Shipping time is added on top.

When does the production time start?

Production starts once you have approved the CAD proof and payment has been made, so time spent revising a file or waiting for approval adds to your overall timeline.

What is the fastest fabric to print?

Sublimation-printed polyester and Lycra, such as Sport Lycra or Poly Stretch Jersey. There is no washing stage, and you can order from 1 m.

Can I speed up my order?

The biggest delays are usually file problems and slow approvals. Send a 300 DPI, seamless, RGB file and approve your CAD promptly. For a fixed deadline, contact us before ordering.

When will I know my delivery date?

We confirm the expected date with your CAD proof. Shipping time to your country is added on top of production.

Hinterlassen Sie einen Kommentar

Bitte beachten Sie, dass Kommentare vor der Veröffentlichung freigegeben werden müssen